last planner system: a standalone construct

One name. One construct. A landmark on the map.

● anchor · a standalone construct Nearest construct by meaning·not indexed
last plannersystem1 CONSTRUCTLast planner systemBALLARD · CONSTRUCTION

A single standalone construct; nearby constructs are located against it in the Collider. Tap a field for its definition, unit, and measures.

Construction management

a production control approach in which crew-level planners commit only to work that is ready, protecting crews from unreliable workflow.

In construction management, last planner system refers to a production control approach in which crew-level planners commit only to work that is ready, protecting crews from unreliable workflow. This meaning comes from Ballard (1998) in Journal of Construction Engineering and Management.[1]

Unit
Recovery means
Measured by

Next

Run it through the Collider, or take the citations with you.

See how last planner system sits against neighbouring constructs in the Collider, or export every reference on this page in one click.

Open in ColliderExport BibTeXReport this entry

Nearby constructs

commit1 fields · 1 citationsanchor · a standalone constructconstruction2 fields · 3 citationsjingle · one word, two carrierscontrol4 fields · 5 citationsjingle · one word, four constructs

References

  1. Ballard, G., & Howell, G. (1998). Shielding Production: Essential Step in Production Control. Journal of Construction Engineering and Management, 124(1), 11-17. https://doi.org/10.1061/(asce)0733-9364(1998)124:1(11)

Cited on this page?

Confirm your construct, or correct us.

If your work is cited behind one of these entries, you know better than we do whether we captured the meaning right. Confirm it, suggest an edit, or dispute it, and your name goes on the entry as an author who has checked it, linked to your ORCID.

Claim your construct