Construct · 1 fields · 1 citations

Olley-Pakes estimator: a standalone construct

One name. One construct. A landmark on the map.

● anchor · a standalone construct Nearest construct by meaning·not indexed
Olley-Pakesestimator1 CONSTRUCTOlley-Pakes estimatorOLLEY · INDUSTRIAL

A single standalone construct; nearby constructs are located against it in the Collider. Tap a field for its definition, unit, and measures.

Industrial organization

production function estimator that uses investment as a proxy for unobserved productivity to correct simultaneity and selection bias.

In industrial organization, Olley-Pakes estimator refers to production function estimator that uses investment as a proxy for unobserved productivity to correct simultaneity and selection bias. This meaning comes from Olley (1996) in Econometrica.[1]

Unit
Recovery means
Measured by

Next

Run it through the Collider, or take the citations with you.

See how Olley-Pakes estimator sits against neighbouring constructs in the Collider, or export every reference on this page in one click.

Open in ColliderExport BibTeXReport this entry

Nearby constructs

bias6 fields · 8 citationsjingle · one name, six constructsestimator2 fields · 2 citationsjingle · one word, two constructsfunction5 fields · 6 citationsjingle · one word, five constructs

References

  1. Olley, G. S., & Pakes, A. (1996). The Dynamics of Productivity in the Telecommunications Equipment Industry. Econometrica, 64(6), 1263. https://doi.org/10.2307/2171831

Cited on this page?

Confirm your construct, or correct us.

If your work is cited behind one of these entries, you know better than we do whether we captured the meaning right. Confirm it, suggest an edit, or dispute it, and your name goes on the entry as an author who has checked it, linked to your ORCID.

Claim your construct