Construct · 1 fields · 1 citations

plan-do-study-act cycle: a standalone construct

One name. One construct. A landmark on the map.

● anchor · a standalone construct Nearest construct by meaning·not indexed
plan-do-study-actcycle1 CONSTRUCTPlan-do-study-act cycleTAYLOR · QUALITY IMPROVEMENT

A single standalone construct; nearby constructs are located against it in the Collider. Tap a field for its definition, unit, and measures.

Quality improvement

an iterative method of testing a change on a small scale, studying the result and refining it.

In quality improvement, plan-do-study-act cycle refers to an iterative method of testing a change on a small scale, studying the result and refining it. This meaning comes from Taylor (2013) in BMJ Quality & Safety.[1]

Unit
Recovery means
Measured by

Next

Run it through the Collider, or take the citations with you.

See how plan-do-study-act cycle sits against neighbouring constructs in the Collider, or export every reference on this page in one click.

Open in ColliderExport BibTeXReport this entry

Nearby constructs

cycle4 fields · 4 citationsjingle · one word, four constructsquality6 fields · 13 citationsjingle · one name, six constructssafety2 fields · 2 citationsjingle · one word, two constructs

References

  1. Taylor, M. J., McNicholas, C., Nicolay, C., Darzi, A., Bell, D., & Reed, J. E. (2013). Systematic review of the application of the plan–do–study–act method to improve quality in healthcare. BMJ Quality & Safety, 23(4), 290-298. https://doi.org/10.1136/bmjqs-2013-001862

Cited on this page?

Confirm your construct, or correct us.

If your work is cited behind one of these entries, you know better than we do whether we captured the meaning right. Confirm it, suggest an edit, or dispute it, and your name goes on the entry as an author who has checked it, linked to your ORCID.

Claim your construct