Construct · 1 fields · 1 citations

seven wastes: a standalone construct

One name. One construct. A landmark on the map.

● anchor · a standalone construct Nearest construct by meaning·not indexed
sevenwastes1 CONSTRUCTSeven wastesOHNO · INDUSTRIAL ENGINEERING

A single standalone construct; nearby constructs are located against it in the Collider. Tap a field for its definition, unit, and measures.

Industrial engineering

classification of non-value-adding activity in production into overproduction, waiting, transport, overprocessing, inventory, motion and defects.

In industrial engineering, seven wastes refers to classification of non-value-adding activity in production into overproduction, waiting, transport, overprocessing, inventory, motion and defects. This meaning comes from Ohno (1988) in Toyota Production System.[1]

Unit
Recovery means
Measured by

Next

Run it through the Collider, or take the citations with you.

See how seven wastes sits against neighbouring constructs in the Collider, or export every reference on this page in one click.

Open in ColliderExport BibTeXReport this entry

Nearby constructs

inventory1 fields · 2 citationsanchor · a standalone constructlean production1 fields · 1 citationsanchor · a standalone constructmotion2 fields · 2 citationsjingle · one word, two constructs

References

  1. Ohno, T. (1988). Toyota Production System. Productivity Press. ISBN 9781000056488

Cited on this page?

Confirm your construct, or correct us.

If your work is cited behind one of these entries, you know better than we do whether we captured the meaning right. Confirm it, suggest an edit, or dispute it, and your name goes on the entry as an author who has checked it, linked to your ORCID.

Claim your construct