ERP project risk factors: a standalone construct

One name. One construct. A landmark on the map.

● anchor · a standalone construct Nearest construct by meaning·not indexed
ERP projectrisk factors1 CONSTRUCTERP project risk factorsSUMNER · INFORMATION SYSTEMS

A single standalone construct; nearby constructs are located against it in the Collider. Tap a field for its definition, unit, and measures.

Information systems

the specific risks of enterprise-wide system projects, such as resistance to re-engineering, lack of internal expertise and consultant dependence.

In information systems, ERP project risk factors refers to the specific risks of enterprise-wide system projects, such as resistance to re-engineering, lack of internal expertise and consultant dependence. This meaning comes from Sumner (2000) in Journal of Information Technology.[1]

Unit
Recovery means
Measured by

Next

Run it through the Collider, or take the citations with you.

See how ERP project risk factors sits against neighbouring constructs in the Collider, or export every reference on this page in one click.

Open in ColliderExport BibTeXReport this entry

Nearby constructs

dependence4 fields · 5 citationsjingle · one word, four constructsinformation4 fields · 5 citationsjingle · one word, four constructsresistance4 fields · 7 citationsjingle · one word, four constructs

References

  1. Sumner, M. (2000). Risk factors in enterprise-wide/ERP projects. Journal of Information Technology, 15(4), 317-327. https://doi.org/10.1080/02683960010009079