Construct · 1 fields · 1 citations

factor model of construction productivity: a standalone construct

One name. One construct. A landmark on the map.

● anchor · a standalone construct Nearest construct by meaning·not indexed
factor model ofconstruction productivity1 CONSTRUCTFactor model ofTHOMAS · CONSTRUCTION

A single standalone construct; nearby constructs are located against it in the Collider. Tap a field for its definition, unit, and measures.

Construction management

model in which crew productivity departs from an ideal curve because of work content, environment and management factors.

In construction management, factor model of construction productivity refers to model in which crew productivity departs from an ideal curve because of work content, environment and management factors. This meaning comes from Thomas (1987) in Journal of Construction Engineering and Management.[1]

Unit
Recovery means
Measured by

Next

Run it through the Collider, or take the citations with you.

See how factor model of construction productivity sits against neighbouring constructs in the Collider, or export every reference on this page in one click.

Open in ColliderExport BibTeXReport this entry

Nearby constructs

construction2 fields · 3 citationsjingle · one word, two carriersenvironment1 fields · 2 citationsanchor · a standalone constructfactor3 fields · 4 citationsjingle · one word, three constructs

References

  1. Thomas, H. R., & Yiakoumis, I. (1987). Factor Model of Construction Productivity. Journal of Construction Engineering and Management, 113(4), 623-639. https://doi.org/10.1061/(asce)0733-9364(1987)113:4(623)

Cited on this page?

Confirm your construct, or correct us.

If your work is cited behind one of these entries, you know better than we do whether we captured the meaning right. Confirm it, suggest an edit, or dispute it, and your name goes on the entry as an author who has checked it, linked to your ORCID.

Claim your construct