Construct · 1 fields · 1 citations

gain scheduling: a standalone construct

One name. One construct. A landmark on the map.

● anchor · a standalone construct Nearest construct by meaning·not indexed
gainscheduling1 CONSTRUCTGain schedulingRUGH · CONTROL ENGINEERING

A single standalone construct; nearby constructs are located against it in the Collider. Tap a field for its definition, unit, and measures.

Control engineering

controlling a nonlinear system by designing linear controllers at several operating points and switching or interpolating among them.

In control engineering, gain scheduling refers to controlling a nonlinear system by designing linear controllers at several operating points and switching or interpolating among them. This meaning comes from Rugh (2000) in Automatica.[1]

Unit
Recovery means
Measured by

Next

Run it through the Collider, or take the citations with you.

See how gain scheduling sits against neighbouring constructs in the Collider, or export every reference on this page in one click.

Open in ColliderExport BibTeXReport this entry

Nearby constructs

control4 fields · 5 citationsjingle · one word, four constructsgain4 fields · 4 citationsjingle · one word, four constructsscheduling3 fields · 7 citationsjingle · one word, three constructs

References

  1. Rugh, W. J., & Shamma, J. S. (2000). Research on gain scheduling. Automatica, 36(10), 1401-1425. https://doi.org/10.1016/s0005-1098(00)00058-3

Cited on this page?

Confirm your construct, or correct us.

If your work is cited behind one of these entries, you know better than we do whether we captured the meaning right. Confirm it, suggest an edit, or dispute it, and your name goes on the entry as an author who has checked it, linked to your ORCID.

Claim your construct