Construct · 3 fields · 7 citations

Where does scheduling collide?

One name. Different field. Different construct. One map.

● jingle · one word, three constructs Nearest construct by meaningschedulecompare the meanings
How to read this

Every construct on the map is compared with every other by the meaning of its definitions, and the closest one is surfaced here. The nearest construct to scheduling is schedule.

Hold this as a prompt, not a verdict. Two constructs sitting close in meaning is a reason to read them side by side and decide for yourself whether they are one idea under two names. It is not proof that they are. Compare the meanings in the Collider.

scheduling3 CONSTRUCTSJob schedulingJOHNSON · JOB SEQUENCINGDrug schedulingUN 1961 · DRUG SCHEDULESUnscheduled DNARASMUSSEN · DNA REPAIR

Spokes are fields; dashed arcs are shared lineage. Tap a field for its definition, unit, and measures.

2026

Drag to watch the word get claimed. Each field appears at the publication date of the earliest source cited for it. Tap a year to see which.

Operations research and computer science

Allocating tasks to resources over time

Johnson's 1954 paper Optimal two- and three-stage production schedules with setup times included gave an algorithm for ordering a set of jobs through machines so that the total time to finish them all is as short as possible, opening the study of scheduling as a formal optimisation problem. Graham, Lawler, Lenstra, and Rinnooy Kan's 1979 survey Optimization and approximation in deterministic sequencing and scheduling organised the field with a notation for describing which resources, jobs, and objectives a problem involves. In this meaning scheduling is the activity of assigning tasks to resources and to positions in time, which job runs where and in what order, so as to optimise a measure such as the time to finish, lateness, or throughput. Here scheduling is a planning and optimisation problem over tasks and machines, not the legal act of placing a drug in a controlled category, and not the cell's timing of when it copies its DNA.[1][2]

Unit
One assignment of tasks to resources and time positions
Recovery means
Not applicable
Measured by
Scored by an objective such as makespan, total flow time, or lateness

Drug control law

Legal classification of a controlled substance

The United Nations Single Convention on Narcotic Drugs of 1961 sorted controlled drugs into four numbered schedules, each carrying a different level of legal restriction according to a drug's risk of abuse and its accepted medical use. The United States Controlled Substances Act of 1970 built the same idea into national law, placing substances in Schedules I through V and setting out a procedure by which an agency can add, move, or remove a drug. In this meaning scheduling is the regulatory act of assigning a substance to a legal control category, and rescheduling is moving it between categories. Here scheduling classifies a drug for legal control, and has nothing to do with ordering jobs on machines or with when a cell copies its DNA.[7][3][4]

Unit
One placement of a substance into a numbered legal schedule
Recovery means
Not applicable
Measured by
Determined by statute and by agency review of a drug's abuse potential and accepted medical use

Cell biology and genetics

DNA synthesis outside the normal replication phase

Rasmussen and Painter's 1964 report Evidence for repair of ultra-violet damaged deoxyribonucleic acid in cultured mammalian cells found cells making new DNA outside the single stretch of the cell cycle set aside for copying the genome, the phase biologists treat as the scheduled period of synthesis. The same authors' 1966 paper Radiation-stimulated DNA synthesis in cultured mammalian cells named this repair-driven copying unscheduled DNA synthesis. In this meaning the schedule is the cell's built-in timetable that confines routine replication to one phase, and unscheduled synthesis is the DNA repair that runs off that timetable, now used as a standard test for genetic damage. Here scheduling is a biological timetable for copying DNA, not a plan for running jobs on machines and not a legal category assigned to a drug.[5][6]

Unit
DNA synthesis events occurring outside the scheduled replication phase
Recovery means
Not applicable
Measured by
Detected by autoradiography or by labelled-nucleotide incorporation in cells not in the replication phase

Next

Run it through the Collider, or take the citations with you.

See how scheduling sits against neighbouring constructs in the Collider, or export every reference on this page in one click.

Open in ColliderExport BibTeXReport this collision

Nearby collisions

schedule3 fields · 4 citationsjingle · one word, three constructsallocation3 fields · 4 citationsjingle · one word, three constructsagency6 fields · 12 citationsjingle · one name, six constructs

References

  1. Johnson, S. M. (1954). Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly, 1(1), 61–68. https://doi.org/10.1002/nav.3800010110
  2. Graham, R. L., Lawler, E. L., Lenstra, J. K., & Rinnooy Kan, A. H. G. (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey. Annals of Discrete Mathematics, 5, 287–326. https://doi.org/10.1016/S0167-5060(08)70356-X
  3. United Nations. (1961). Single Convention on Narcotic Drugs, 1961. United Nations.
  4. Controlled Substances Act, Pub. L. No. 91-513, 84 Stat. 1236 (1970) (codified as amended at 21 U.S.C. § 801 et seq.).
  5. Rasmussen, R. E., & Painter, R. B. (1964). Evidence for repair of ultra-violet damaged deoxyribonucleic acid in cultured mammalian cells. Nature, 203(4952), 1360–1362. https://doi.org/10.1038/2031360a0
  6. Rasmussen, R. E., & Painter, R. B. (1966). Radiation-stimulated DNA synthesis in cultured mammalian cells. The Journal of Cell Biology, 29(1), 11–19. https://doi.org/10.1083/jcb.29.1.11
  7. Courtwright, D. T. (2004). The Controlled Substances Act: how a “big tent” reform became a punitive drug law. Drug and Alcohol Dependence, 76(1), 9–15. https://doi.org/10.1016/j.drugalcdep.2004.04.012

Cited on this page?

Confirm your construct, or correct us.

If your work is cited behind one of these entries, you know better than we do whether we captured the meaning right. Confirm it, suggest an edit, or dispute it, and your name goes on the entry as an author who has checked it, linked to your ORCID.

Claim your construct