Construct · 1 fields · 1 citations

hoshin kanri: a standalone construct

One name. One construct. A landmark on the map.

● anchor · a standalone construct Nearest construct by meaning·not indexed
hoshinkanri1 CONSTRUCTHoshin kanriTENNANT · QUALITY MANAGEMENT

A single standalone construct; nearby constructs are located against it in the Collider. Tap a field for its definition, unit, and measures.

Quality management

a planning method that cascades strategic goals through the organization by negotiated catchball between levels.

In quality management, hoshin kanri refers to a planning method that cascades strategic goals through the organization by negotiated catchball between levels. This meaning comes from Tennant (2001) in Long Range Planning.[1]

Unit
Recovery means
Measured by

Next

Run it through the Collider, or take the citations with you.

See how hoshin kanri sits against neighbouring constructs in the Collider, or export every reference on this page in one click.

Open in ColliderExport BibTeXReport this entry

Nearby constructs

quality6 fields · 13 citationsjingle · one name, six constructsrange4 fields · 6 citationsjingle · one word, four constructs

References

  1. Tennant, C., & Roberts, P. (2001). Hoshin Kanri: Implementing the Catchball Process. Long Range Planning, 34(3), 287-308. https://doi.org/10.1016/s0024-6301(01)00039-5

Cited on this page?

Confirm your construct, or correct us.

If your work is cited behind one of these entries, you know better than we do whether we captured the meaning right. Confirm it, suggest an edit, or dispute it, and your name goes on the entry as an author who has checked it, linked to your ORCID.

Claim your construct