Construct · 1 fields · 1 citations

Olympic cost overruns: a standalone construct

One name. One construct. A landmark on the map.

● anchor · a standalone construct Nearest construct by meaning·not indexed
Olympic costoverruns1 CONSTRUCTOlympic cost overrunsFLYVBJERG · SPORT MANAGEMENT

A single standalone construct; nearby constructs are located against it in the Collider. Tap a field for its definition, unit, and measures.

Sport management

the systematic tendency for Olympic Games to exceed budgets, with overruns following a fat-tailed distribution.

In sport management, Olympic cost overruns refers to the systematic tendency for Olympic Games to exceed budgets, with overruns following a fat-tailed distribution. This meaning comes from Flyvbjerg (2020) in Environment and Planning A: Economy and Space.[1]

Unit
Recovery means
Measured by

Next

Run it through the Collider, or take the citations with you.

See how Olympic cost overruns sits against neighbouring constructs in the Collider, or export every reference on this page in one click.

Open in ColliderExport BibTeXReport this entry

Nearby constructs

cost4 fields · 4 citationsjingle · one word, four constructsdistribution2 fields · 2 citationsjingle · one word, two constructsenvironment1 fields · 2 citationsanchor · a standalone construct

References

  1. Flyvbjerg, B., Budzier, A., & Lunn, D. (2020). Regression to the tail: Why the Olympics blow up. Environment and Planning A: Economy and Space, 53(2), 233-260. https://doi.org/10.1177/0308518x20958724

Cited on this page?

Confirm your construct, or correct us.

If your work is cited behind one of these entries, you know better than we do whether we captured the meaning right. Confirm it, suggest an edit, or dispute it, and your name goes on the entry as an author who has checked it, linked to your ORCID.

Claim your construct