Construct · 1 fields · 1 citations

risk area accuracy: a standalone construct

One name. One construct. A landmark on the map.

● anchor · a standalone construct Nearest construct by meaning·not indexed
risk areaaccuracy1 CONSTRUCTRisk area accuracyARLIKATTI · EMERGENCY

A single standalone construct; nearby constructs are located against it in the Collider. Tap a field for its definition, unit, and measures.

Emergency management

whether residents correctly know if they live inside an official hazard or evacuation zone, which shapes their evacuation expectations.

In emergency management, risk area accuracy refers to whether residents correctly know if they live inside an official hazard or evacuation zone, which shapes their evacuation expectations. This meaning comes from Arlikatti (2006) in Environment and Behavior.[1]

Unit
Recovery means
Measured by

Next

Run it through the Collider, or take the citations with you.

See how risk area accuracy sits against neighbouring constructs in the Collider, or export every reference on this page in one click.

Open in ColliderExport BibTeXReport this entry

Nearby constructs

accuracy3 fields · 6 citationsjingle · one word, three constructsenvironment1 fields · 2 citationsanchor · a standalone constructrisk6 fields · 13 citationsjingle · one name, six constructs

References

  1. Arlikatti, S., Lindell, M. K., Prater, C. S., & Zhang, Y. (2006). Risk Area Accuracy and Hurricane Evacuation Expectations of Coastal Residents. Environment and Behavior, 38(2), 226-247. https://doi.org/10.1177/0013916505277603

Cited on this page?

Confirm your construct, or correct us.

If your work is cited behind one of these entries, you know better than we do whether we captured the meaning right. Confirm it, suggest an edit, or dispute it, and your name goes on the entry as an author who has checked it, linked to your ORCID.

Claim your construct