Construct · 1 fields · 1 citations

economic lot scheduling problem: a standalone construct

One name. One construct. A landmark on the map.

● anchor · a standalone construct Nearest construct by meaning·not indexed
economic lotscheduling problem1 CONSTRUCTEconomic lot schedulingELMAGHRABY · OPERATIONS

A single standalone construct; nearby constructs are located against it in the Collider. Tap a field for its definition, unit, and measures.

Operations management

scheduling the production of several items on one facility in a cyclic way that minimizes setup and holding costs.

In operations management, economic lot scheduling problem refers to scheduling the production of several items on one facility in a cyclic way that minimizes setup and holding costs. This meaning comes from Elmaghraby (1978) in Management Science.[1]

Unit
Recovery means
Measured by

Next

Run it through the Collider, or take the citations with you.

See how economic lot scheduling problem sits against neighbouring constructs in the Collider, or export every reference on this page in one click.

Open in ColliderExport BibTeXReport this entry

Nearby constructs

holding2 fields · 2 citationsjingle · one word, two constructsoperation1 fields · 1 citationsanchor · a standalone constructscheduling3 fields · 7 citationsjingle · one word, three constructs

References

  1. Elmaghraby, S. E. (1978). The Economic Lot Scheduling Problem (ELSP): Review and Extensions. Management Science, 24(6), 587-598. https://doi.org/10.1287/mnsc.24.6.587

Cited on this page?

Confirm your construct, or correct us.

If your work is cited behind one of these entries, you know better than we do whether we captured the meaning right. Confirm it, suggest an edit, or dispute it, and your name goes on the entry as an author who has checked it, linked to your ORCID.

Claim your construct