quay crane scheduling problem: a standalone construct

One name. One construct. A landmark on the map.

● anchor · a standalone construct Nearest construct by meaning·not indexed
quay cranescheduling problem1 CONSTRUCTQuay crane schedulingDAGANZO · MARITIME LOGISTICS

A single standalone construct; nearby constructs are located against it in the Collider. Tap a field for its definition, unit, and measures.

Maritime logistics

assigning quay cranes to ship holds over time so that loading and unloading finish as quickly or cheaply as possible.

In maritime logistics, quay crane scheduling problem refers to assigning quay cranes to ship holds over time so that loading and unloading finish as quickly or cheaply as possible. This meaning comes from Daganzo (1989) in Transportation Research Part B: Methodological.[1]

Unit
Recovery means
Measured by

Next

Run it through the Collider, or take the citations with you.

See how quay crane scheduling problem sits against neighbouring constructs in the Collider, or export every reference on this page in one click.

Open in ColliderExport BibTeXReport this entry

Nearby constructs

finish1 fields · 1 citationsanchor · a standalone constructscheduling3 fields · 7 citationsjingle · one word, three constructstransportation3 fields · 6 citationsjingle · one word, three constructs

References

  1. Daganzo, C. F. (1989). The crane scheduling problem. Transportation Research Part B: Methodological, 23(3), 159-175. https://doi.org/10.1016/0191-2615(89)90001-5

Cited on this page?

Confirm your construct, or correct us.

If your work is cited behind one of these entries, you know better than we do whether we captured the meaning right. Confirm it, suggest an edit, or dispute it, and your name goes on the entry as an author who has checked it, linked to your ORCID.

Claim your construct