Construct · 1 fields · 1 citations

Smith's rule: a standalone construct

One name. One construct. A landmark on the map.

● anchor · a standalone construct Nearest construct by meaning·not indexed
Smith'srule1 CONSTRUCTSmith's ruleSMITH · PRODUCTION SCHEDULING

A single standalone construct; nearby constructs are located against it in the Collider. Tap a field for its definition, unit, and measures.

Production scheduling

single-machine sequencing result that ordering jobs by processing time divided by weight minimizes total weighted completion time.

In production scheduling, Smith's rule refers to single-machine sequencing result that ordering jobs by processing time divided by weight minimizes total weighted completion time. This meaning comes from Smith (1956) in Naval Research Logistics Quarterly.[1]

Unit
Recovery means
Measured by

Next

Run it through the Collider, or take the citations with you.

See how Smith's rule sits against neighbouring constructs in the Collider, or export every reference on this page in one click.

Open in ColliderExport BibTeXReport this entry

Nearby constructs

scheduling3 fields · 7 citationsjingle · one word, three constructsweight4 fields · 4 citationsjingle · one word, four constructs

References

  1. Smith, W. E. (1956). Various optimizers for single‐stage production. Naval Research Logistics Quarterly, 3(1-2), 59-66. https://doi.org/10.1002/nav.3800030106

Cited on this page?

Confirm your construct, or correct us.

If your work is cited behind one of these entries, you know better than we do whether we captured the meaning right. Confirm it, suggest an edit, or dispute it, and your name goes on the entry as an author who has checked it, linked to your ORCID.

Claim your construct